The Plant consist of:
  • A Melt shop with the capacity of 60.000 ton/year. With a 25 tons/heat ladle capacity electric arc furnace for producing100-130 mm. square billets which are semi-finished material for the bar mill.

  • A bar mill with capacity of 150.000 ton/year for bar mill and re-bar production from diameter 8 mm to 25 mm
    Angles from 25-3 to 50-4 mm
    Flats from 16-3 to 60-10


1- Built Area:
    33055 m2

2- Total Investment Coast:
   
USD 38 millions.

3- Total capacity:
     150,000 Tons/year.

4- Labour Force:
    1 manager, 10 engineers and 120 laboures.

5- Contracting date:
     March 1997

6- Commencing date:
    July 1999

7- Technical Specifications:
The angles produced are from 25-3 to 50-3 mm and the flats    from 16-3 to
     60-10 mm