The Plant consist of:
- A Melt shop with the capacity of
60.000 ton/year. With a 25 tons/heat ladle capacity electric arc
furnace for producing100-130 mm. square billets which are
semi-finished material for the bar mill.

- A bar mill with capacity of 150.000
ton/year for bar mill and re-bar production from diameter 8 mm to 25
mm
Angles from 25-3 to 50-4 mm
Flats from 16-3 to 60-10

1- Built Area:
33055 m2
2- Total Investment Coast:
USD 38 millions.
3- Total capacity:
150,000 Tons/year.
4- Labour Force:
1 manager, 10 engineers and 120 laboures.
5- Contracting date:
March 1997
6- Commencing date:
July 1999
7- Technical Specifications:
The angles produced are from 25-3 to 50-3
mm and the flats from 16-3 to
60-10 mm
|